Desuperheater and ECM motor/Upflow Kit
Geothermal heat Pump 4 ton 2 stage Climatemaster Install Package SZT048AGDR0RPVS
Geothermal heat Pump 4 ton 2 stage Climatemaster Install Package SZT048AGDR0RPVS

Geothermal heat Pump 4 ton 2 stage Climatemaster Install Package SZT048AGDR0RPVS

Regular price $27,960.00 Sale price$16,270.00
/
Shipping calculated at checkout.

  • Free shipping in the continental United States
  • Low stock - 2 items left
  • Backordered, shipping soon

Single phase 208/230 voltage 25.2 min circuit amps 21.4 FLA
22.4 W X 26.0 D X 46.5 H 233 lbs

Kit Includes:

4 ton 2 stage SZT048AGDR0RPVS

Desuperheater and ECM motor/Upflow

B&D QT 2 pump flow center 
Hose kit and fittings
Thermostat (3 heat/2 cool)

Interior manifold
4 rolls of 600 feet lengths of 3/4'' hdpe geothermal pipe or 4 rolls of 410 feet lengths of hdpe loops (205 up/205 down with ubend)
(Photo is a stock photo. This package includes 2 rolls of pipe.)

*Needs Climatemaster ATC32U02 Communicating Thermostat to make this system operate properly.

 10 year parts and 5 year labor warranty

Click here for installation manual.

Click here for product catalog.

 

*Free gift with Purchase* 
Technician's test Kit - includes pressure gauge with needle for the PT port testing, digital temperature probe and compact padded case. This kit allows technicians to diagnose and trouble shoot Geothermal systems, calibrate flow rates, determine super heat of system for performance testing.

Free shipping to LTL freight center or business with dock or forklift. 

 We will gladly help with all of your questions.

515-402-8004

Essentials

Geothermal Products

Discover our complete range of high-performance parts and components to support any geothermal system, from residential installs to commercial applications.

Reliable

Explore top-quality geothermal system parts engineered for durability, compatibility, and energy efficiency — everything you need, all in one place.

Sustainable

Energy Solutions

Shop environmentally friendly geothermal products designed to maximize performance while reducing long-term energy costs and environmental impact.